Raising a Queenslander: what changes underneath

Fletcher Fraser

·

3 Jul 2026

·

7 min read

Lifting a timber house is the easy part. The decisions about stumps, bracing, drainage and the new lower level are where the project is won or lost.

Raising a Queenslander: what changes underneath

A raise in progress, the house on temporary steel


Raising a Queenslander is one of the most photographed moments in Brisbane building: a whole timber house in the air on steel, a crew underneath, the neighbours watching. It is also, honestly, the easy part. The house comes up in a day. What happens in the months afterwards is where the project is won or lost.

Stumps, bracing and the new ground floor

The original house was built to stand on stumps, and it moves a little as they do. Once it sits on a new lower level it stops moving, and the new structure has to take the loads the stumps used to share. That means a geotechnical test, a structural engineer’s design for footings and bracing, and a lot of steel you will never see. We book and pay the consultants and build from their documents.

Drainage is the quiet one. A house that used to sit over open ground now sits over rooms, and every drop of water that ran under it has to be collected and carried away. Get this wrong and the new level is damp within a year. Get it right and nobody ever thinks about it, which is the point.

Where the stair lands

The single decision that shapes a raise is the stair. It has to arrive somewhere useful upstairs, in a house that was never planned for one, and land somewhere generous downstairs. We draw it first, in concept, because everything else on both levels moves around it.

Most of our raises take nine to twelve months on site. Most families move out for the build. Both of those facts are on the table at the first meeting, along with the estimate, so nobody is surprised by the shape of the year ahead.

“Lifting the house is a day’s work. Deciding what to put under it is the project.”

Raising a Queenslander: what changes underneath: second image

The finished lower level at Arch House


Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best homes begin with a simple conversation.

/03

We take on a limited number of renovations each year and book well in advance. If you’re planning a significant renovation, we’d love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best homes begin with a simple conversation.

/03

We take on a limited number of renovations each year and book well in advance. If you’re planning a significant renovation, we’d love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best homes begin with a simple conversation.

/03

We take on a limited number of renovations each year and book well in advance. If you’re planning a significant renovation, we’d love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

9 FORSYTH ST,

FAIRFIELD QLD 4103,

AUSTRALIA

QBCC 22698 · QBCC 15229232

MEMBER — MASTER BUILDERS AUSTRALIA

© 2026 FSX DEVELOPMENTS PTY LTD