Planning and Approvals in Brisbane

01

Chelmer, 2026 · A character home, rear demolition approved and under way

WHAT IT IS

Between the drawings and the contract sits the plan stage. One agreement, run by us, that turns a set of drawings into an engineered, approvable house and a fixed price. Nothing in the number is a guess about your block.

TIMEFRAME

6 – 8 weeks, plus a DA if one is needed

SUITED TO

Every major renovation needs planning before construction starts. Anyone with drawings and no approvals, ours or another designer’s.

Projects approved and built

135 in Brisbane

SOILS · ENGINEERING · APPROVALS · FIXED PRICE · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Planning and Approvals in Brisbane

01

Chelmer, 2026 · A character home, rear demolition approved and under way

WHAT IT IS

Between the drawings and the contract sits the plan stage. One agreement, run by us, that turns a set of drawings into an engineered, approvable house and a fixed price. Nothing in the number is a guess about your block.

TIMEFRAME

6 – 8 weeks, plus a DA if one is needed

SUITED TO

Every major renovation needs planning before construction starts. Anyone with drawings and no approvals, ours or another designer’s.

Projects approved and built

135 in Brisbane

SOILS · ENGINEERING · APPROVALS · FIXED PRICE · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Planning and Approvals in Brisbane

01

Chelmer, 2026 · A character home, rear demolition approved and under way

WHAT IT IS

Between the drawings and the contract sits the plan stage. One agreement, run by us, that turns a set of drawings into an engineered, approvable house and a fixed price. Nothing in the number is a guess about your block.

TIMEFRAME

6 – 8 weeks, plus a DA if one is needed

SUITED TO

Every major renovation needs planning before construction starts. Anyone with drawings and no approvals, ours or another designer’s.

Projects approved and built

135 in Brisbane

We take a house through planning most weeks. Council has no surprises left for us.

/01

ONE AGREEMENT

Consultants and council, run by us

YOU PAY

YOU PAY

$10–15K inc GST, consultants included

YOU RECEIVE

YOU RECEIVE

Engineered, approvable drawings and a contract ready to sign

CREDITED

CREDITED

$5K when you build with us

St Lucia, 2025

ST LUCIA, 2025 · TWO NEW HOUSES ON ONE BLOCK, PRICED FROM FINISHED DRAWINGS

WHERE IT SITS

Design, plan, build. Three agreements, and this is the second. It starts when the drawings are finished and ends when a construction contract is signed.

The plan stage, week by week

/02

WEEKS 1–2

WEEKS 1–2

Agreement and soils

Plan agreement signed, every overlay and code read, the soil test booked and back. You learn which approvals path you are on.

YOU LEAVE WITH

Town planning advice · Soils report

WEEKS 3–6

WEEKS 3–6

Engineering and reports

Footings, steel, bracing, raise and retaining designed from our drawings. The energy report and services review run alongside.

YOU LEAVE WITH

Structural drawings · Energy certificate · Services review

WEEKS 6–8

WEEKS 6–8

The quote

The build priced from the engineered set and put in writing. Accept it and you are ready to sign. Where a development application is needed, it is lodged in parallel.

YOU LEAVE WITH

Fixed-price quote · DA lodged if needed

AFTER CONTRACT

AFTER CONTRACT

Building approval

Lodged the week you sign, with any siting relaxation, and issued inside the three months before site start.

YOU LEAVE WITH

Building approval · Plumbing approval · Siting relaxation

Most surprises on a renovation are found in the ground or at council. We go looking for both before we price the house.

FIRST MEETING AT THE STUDIO · NO CHARGE · BRING YOUR DRAWINGS

The plan stage, delivered

SOILS REPORT

SOILS REPORT

GEOTECHNICAL

STRUCTURAL DRAWINGS

STRUCTURAL DRAWINGS

CERTIFIED

ENERGY CERTIFICATE

ENERGY CERTIFICATE

COMPLIANT

SERVICES REVIEW

SERVICES REVIEW

LOCATED

APPROVALS PATH

APPROVALS PATH

MAPPED · DA LODGED IF NEEDED

FIXED-PRICE QUOTE

FIXED-PRICE QUOTE

IN WRITING

Then a Master Builders contract, 5% deposit, and the building approval lodged the week you sign.

DA or BA? Which approval your house needs

/03

/03

Every house needs a BA. Some also need a DA first. Most of ours don’t.

St Lucia, 2025

GRACEVILLE, 2022 · RAISED CLEAR OF FUTURE FLOODS UNDER THE RESILIENT HOMES FUND



BA

BUILDING APPROVAL · EVERY HOUSE

DA

DEVELOPMENT APPLICATION · SOME HOUSES

WHO DECIDES

A private certifier, engaged by us

Brisbane City Council

WHEN

WHEN

Mapped in planning, lodged the week you sign the contract

Prepared and lodged during planning, before the quote is accepted

WHAT IT CHECKS

That the drawings meet the building code: structure, fire, energy, plumbing and drainage

How the house sits on the block, its height and how it looks from the street

DO YOU NEED IT

Always

Only when building outside accepted development

HOW LONG

HOW LONG

Lodged the week you sign; issued inside the three months before site start

Adds two months or more. The BA still follows

WHO HANDLES IT

Us. We brief the certifier, with any siting relaxation and plumbing approval alongside

Us. We prepare the application, lodge it and deal with council

Character and heritage

Character and heritage

/04

The overlay protects the street, not the whole house.

Most of the houses we work on sit under Brisbane City Council’s traditional building character overlay. It is a short list of things you cannot do to the front of a pre-1946 house, and a long list of things nobody minds.

WHAT IT PROTECTS

WHAT IT PROTECTS

The form of the house as seen from the footpath: the roof, the verandah, the front windows and the house on its stumps. Demolishing the original front is what the overlay exists to stop.

WHAT IT ALLOWS

WHAT IT ALLOWS

Raising and building under, within the height limit. Extending behind the main roof line. Replacing what is rotten like for like. Most of our renovations sit inside these rules and are certified privately.

WHAT WE DO

WHAT WE DO

Read the overlay, design to it rather than against it, and find the best approvals path for the house. You go into a fixed-price building contract knowing the approval is settled ahead of time.

Hawthorne, 2024

HAWTHORNE, 2024 · HERITAGE HOUSE, THE NEW CARPORT DESIGNED TO THE ORIGINAL FRONT

Value engineering

/05

Coorparoo, 2025

COORPAROO, 2025 · A CHARACTER HOUSE RECONFIGURED INSIDE, THE STREET FRONT KEPT

Over-engineering is the quiet way a renovation goes over budget.

Footings, steel, bracing, raise and retaining designed from our drawings, by engineers who know a timber house on a Brisbane block. Sized for what the ground and the house need, and no more. It is where a fixed price is won or lost, and it happens before you sign.

Common questions

/06

Is this the same as a preliminary agreement?

Other builders call this a preliminary agreement, and the paperwork does the same job: soils, engineering, approvals and a price before a construction contract. We call it the plan agreement because there is nothing preliminary about it. The soil test is the real one, the engineering is what gets built, and the price at the end is fixed.

What does planning cost?

$10–15K including the consultants and GST, paid up front so the work can start. $5K of it is credited to the construction contract when you build with us, on top of the $5K design credit, so $10K in total across both stages. Extra consultants for flood, noise or bushfire overlays are identified early and quoted separately.

Do I need a development application for a character house?

Usually not. The character overlay protects the street-facing form of a pre-1947 house; raising, building under, extending behind the ridge and like-for-like repair stay inside its codes and are certified privately. Demolishing the front, siting past the codes or a listed house needs a development application, which we prepare and lodge in the plan stage.

Why is the building approval lodged after the contract?

Because the approval is issued against a specific set of drawings and a builder. We map the path and resolve the questions in planning, then lodge the week the contract is signed, so the approval is current when the crew arrives about three months later.

How long does council take?

Council time is the one part of the process we do not control, and we say so at the start. A development application typically adds two months or more depending on complexity. We lodge complete applications to avoid requests for more information, and once you have signed a contract your build slot is held while we wait.

What if the soils report changes the design?

It usually changes the footings, not the plan. Reactive clay or a slope means deeper footings, more steel or a retaining wall, and the quote reflects that before you sign. That is the point of doing engineering before pricing.

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/07

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/07

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/07

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

9 FORSYTH ST,

FAIRFIELD QLD 4103,

AUSTRALIA

QBCC 22698 · QBCC 15229232

MEMBER — MASTER BUILDERS AUSTRALIA

© 2026 FSX DEVELOPMENTS PTY LTD