Knockdown and Rebuild in Brisbane: cover, Stark Builders

Knockdown and Rebuild in Brisbane

01

St Lucia, 2025 · The stair and void of the new house

WHAT IT IS

Taking a post-war house that has reached the end of its life down to the ground, and building the home the block deserves.

TIMEFRAME

12–16 months on site

SUITED TO

Houses built from 1947 onwards in inner Brisbane where the work would touch every room

Projects completed

135 in Brisbane

CONTRACT

DEMOLITION · DESIGN · APPROVALS · FIXED PRICE · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Knockdown and Rebuild in Brisbane: cover, Stark Builders

Knockdown and Rebuild in Brisbane

01

St Lucia, 2025 · The stair and void of the new house

WHAT IT IS

Taking a post-war house that has reached the end of its life down to the ground, and building the home the block deserves.

TIMEFRAME

12–16 months on site

SUITED TO

Houses built from 1947 onwards in inner Brisbane where the work would touch every room

Projects completed

135 in Brisbane

CONTRACT

DEMOLITION · DESIGN · APPROVALS · FIXED PRICE · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Knockdown and Rebuild in Brisbane: cover, Stark Builders

Knockdown and Rebuild in Brisbane

01

St Lucia, 2025 · The stair and void of the new house

WHAT IT IS

Taking a post-war house that has reached the end of its life down to the ground, and building the home the block deserves.

TIMEFRAME

12–16 months on site

SUITED TO

Houses built from 1947 onwards in inner Brisbane where the work would touch every room

Projects completed

135 in Brisbane

CONTRACT

We take the house down and keep everything that made you buy it: the street, the block, the neighbours.

Knockdown and Rebuild in Brisbane: bleed, Stark Builders

ST LUCIA · NEW HOME · COMPLETED

THE BLOCK STAYED. EVERYTHING ON IT IS NEW.

/01

/01

What it involves

Knockdown and Rebuild in Brisbane: overview, Stark Builders

Most of the houses we knock down were built in 1947 or later: brick, fibro or timber homes that were never made to last a century and have reached the point where fixing them means touching every room.

WHY REBUILD RATHER THAN RENOVATE

We do not build on vacant land in new estates. Our new homes are built in the inner and middle suburbs of Brisbane, on blocks that already have a house on them, for owners who want to stay in the street and start again.

Same block, new footprint

Same block, new footprint

/02

/02

OLD HOUSE · 1962

NEW HOUSE

STREET BELOW · NORTH UP

STREET BELOW · NORTH UP

ST LUCIA · SITE PLAN, OLD HOUSE AND NEW, TO THE SAME SCALE

ST LUCIA · SITE PLAN, OLD HOUSE AND NEW, TO THE SAME SCALE

Nothing about the block changes. Everything about how the house sits on it does.

A knockdown is the one time the plan starts from the boundary, not from the walls that happen to be there. Before we draw, we measure what the block already knows: where the light comes from, where the trees are, what the neighbours can see, and what planning allows today rather than what was built in 1962.

ORIENTATION

ORIENTATION

Living rooms turned north to the yard, not west to the street.

FOOTPRINT

FOOTPRINT

Two storeys on a smaller footprint. The ground floor gives back garden.

SETBACKS

SETBACKS

Set to what the planning scheme allows now, not to where the old walls stood.

WHAT STAYED

WHAT STAYED

The boundary trees, the address and the neighbours. Nothing else.

Why Stark for a knockdown and rebuild

/03

A new house is the one project where nothing is inherited, so every decision is a design decision and every design decision has a price. Having the people who build it in the room where it is drawn is how the price stays fixed.

The Stark Builders crew standing under a raised Queenslander mid-build, Brisbane

THE STARK CREW · UNDER A RAISED QUEENSLANDER

ONE CREW, FIRST DRAWING TO HANDOVER

DESIGN AND BUILD, ONE STUDIO

Our architectural designers and our builder sit at the same table from the first sketch. What gets drawn can be priced, approved and built, so the fixed price is set from the finished drawings, not a brochure.

INNER BRISBANE SINCE 1989

Thirty-seven years of building on the same sloping, tight, tree-covered blocks. We know what the soil does, what council asks and what the neighbours notice.

ONE CREW, FIXED PRICE, WARRANTED

The same people from demolition to handover, a Master Builders fixed-price contract, no markup on variations or PC items, and a seven-year structural warranty.

THE PROOF

THE PROOF

GOOGLE RATING

GOOGLE RATING

4.8

Projects completed

135 in Brisbane

STRUCTURAL WARRANTY

STRUCTURAL WARRANTY

7 YEARS

7 YEARS

MASTER BUILDERS

MASTER BUILDERS

SINCE 1989

QBCC

QBCC

15229232

15229232

Knockdown and Rebuild in Brisbane: mid, Stark Builders

WEEK 8 · SLAB DOWN, FRAME GOING UP

ST LUCIA

Knockdown and Rebuild in Brisbane: mid detail, Stark Builders
Knockdown and Rebuild in Brisbane: mid detail, Stark Builders

THE FIRST NEW WALL ON A CLEARED BLOCK

How it happens

/04

/04

The knockdown and rebuild process, from consult to handover

01

01

Consult

FREE · 1 HOUR

We meet at the studio, talk through the old house and what the new one needs to do, and give you an honest first estimate and a view on whether a knockdown is the right call.

02

02

Design

UP TO 4 MONTHS

Our architectural designers draw two concepts for the block, each with an estimate, then develop the one you choose into a full set of drawings, with a second estimate from the finished set.

03

03

Plan

ABOUT 2 MONTHS + COUNCIL

Soils and engineering, energy compliance, service connections and the approvals path. A development application, where demolition needs one, is lodged now. Then the fixed-price quote.

04

04

Build

12–16 MONTHS ON SITE

Demolition, civil works, slab, frame, enclosure, fit-out and landscaping with one crew and a site meeting at every milestone.

04 BUILD · A NEW HOUSE, MONTH BY MONTH

Knockdown and Rebuild in Brisbane: strip image 1, Stark Builders

WEEK 1 · THE OLD HOUSE COMES DOWN

Knockdown and Rebuild in Brisbane: strip image 2, Stark Builders

WEEK 8 · SLAB AND FRAME

Rebuild, renovate or raise?

/07

Three ways to get the house you want on the block you have.

Compared on the four things that decide it: footprint, cost, time and what survives.

KNOCKDOWN AND REBUILD

THIS PAGE

THIS PAGE

FOOTPRINT

FOOTPRINT

Footprint reset to what planning allows

COST

COST

Highest cost band, includes demolition

TIME

TIME

12–16 months, out throughout

WHAT SURVIVES

WHAT SURVIVES

Nothing of the old house survives

In their words

/08

What Brisbane clients say about their knockdown and rebuild

Our project was complex, with multiple consultants and BA and DA conditions. Fletcher and Xanthe kept us informed, were transparent at every stage and genuinely cared about the outcome. The workmanship is exceptional and the result exceeded our expectations.

THE OWNERS

WHERE WE KNOCK DOWN AND REBUILD

ST LUCIA · INDOOROOPILLY · TARINGA · TOOWONG · ASHGROVE · KEDRON · WAVELL HEIGHTS · CAMP HILL · CARINA · HOLLAND PARK

Is a knockdown right for your house?

/10

If three or more of these are true, it usually is.

Not every tired house should come down, and we will tell you if yours is one to keep. But the houses that suit a knockdown share a few things.

Built in 1947 or later

Council protects pre-war houses; post-war houses can usually be demolished under a building approval.

The work would touch every room

When nothing is left alone, a renovation is a new house with old problems.

Repairs and rework near eighty percent of new

Past that line the new house is the cheaper decision over its life.

Brick, fibro or a slab that will not lift

Houses that cannot be raised or easily extended are the usual knockdowns.

The plan is wrong, not just old

Rooms in the wrong place, no connection to the yard, a house facing the wrong way.

You want to stay in the street

The block, the school and the neighbours are right. Only the house is not.

Before you start

/11

Demolition approvals, overlays and site rules for rebuilding in Brisbane

Four things worth knowing before you call anyone.

None of them rule a knockdown out. They decide the approvals path, the program and where the money goes.

01

ASBESTOS

Most post-war houses have it somewhere. Testing, removal and clearance are quoted, included and done before anything else comes down.

02

DEMOLITION

Asbestos removal, disconnections, tree protection or removal and civil works are all quoted and included. The old house is completely removed.

03

LIVING

You are out of the house for the whole build, 12–16 months. Rent is part of the budget conversation from the first meeting.

04

THE SITE

Slope, soil and stormwater set the slab, the footings and the retaining. Soils and engineering happen in the plan stage so the fixed price is built on them.

Knockdown and Rebuild: Stark Builders project photo, Brisbane

THE NEW LIVING ROOM · ST LUCIA

The block already knew where the light came from. The new house was drawn to meet it.

Common questions

/12

Knockdown and rebuild questions from Brisbane homeowners

How long does a knockdown and rebuild take?

Twelve to sixteen months on site, with up to four months of design and about two months of planning before that. Demolition itself takes days; the new house takes the year.

Can a pre-1947 house be demolished?

Rarely. Brisbane City Council protects pre-war houses under the character overlays and demolition needs a development application with a real case behind it. There are avenues, and we will tell you at the first meeting whether yours has one. Most of our knockdowns are houses built in 1947 or later.

Do we need a development application?

Often not. A post-war house on an unconstrained block can usually be demolished and rebuilt under a building approval from a private certifier. Where demolition, siting or an overlay needs a development application, we prepare and lodge it in the plan stage and it adds two months or more.

What does a knockdown and rebuild cost?

A knockdown and rebuild starts at around a million dollars and goes up with size, storeys, slope and finish. You hear a range at the first meeting, an estimate with each concept, a tighter estimate from the final drawings and a fixed price at the end of planning.

Who designs the house?

Our own architectural designers, working with the builder who will build it. Two concepts, each with an estimate, then the developed design you sign off before the final drawings.

STILL HAVE A QUESTION?

STILL HAVE A QUESTION?

Ask us directly.

A short call is usually the quickest way to work out whether your house should be renovated or replaced, and what either would involve.

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/12

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/12

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/12

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

9 FORSYTH ST,

FAIRFIELD QLD 4103,

AUSTRALIA

QBCC 22698 · QBCC 15229232

MEMBER — MASTER BUILDERS AUSTRALIA

© 2026 FSX DEVELOPMENTS PTY LTD