WHAT IT IS

A major renovation changes the structure, size or plan of a house, not just its finishes. Raising, extending, replanning and restoring Brisbane’s Queenslanders and character homes is the core of what we do.

TIMEFRAME

6–12 months on site, after 4–6 months of design and approvals

SUITED TO

Queenslanders, character and heritage-listed homes that need more than a refresh

PROJECTS COMPLETED

135 in Brisbane

CONTRACT

Fixed price, set once the design and approvals are complete

RAISE · EXTEND · REPLAN · RESTORE · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Major Home Renovations Brisbane

01

FAIRFIELD, 2025 · THE MEETING ROOM AT OUR STUDIO, WHERE EVERY RENOVATION STARTS

WHAT IT IS

A major renovation changes the structure, size or plan of a house, not just its finishes. Raising, extending, replanning and restoring Brisbane’s Queenslanders and character homes is the core of what we do.

TIMEFRAME

6–12 months on site, after 4–6 months of design and approvals

SUITED TO

Queenslanders, character and heritage-listed homes that need more than a refresh

PROJECTS COMPLETED

135 in Brisbane

CONTRACT

Fixed price, set once the design and approvals are complete

RAISE · EXTEND · REPLAN · RESTORE · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Major Home Renovations Brisbane

01

FAIRFIELD, 2025 · THE MEETING ROOM AT OUR STUDIO, WHERE EVERY RENOVATION STARTS

WHAT IT IS

A major renovation changes the structure, size or plan of a house, not just its finishes. Raising, extending, replanning and restoring Brisbane’s Queenslanders and character homes is the core of what we do.

TIMEFRAME

6–12 months on site, after 4–6 months of design and approvals

SUITED TO

Queenslanders, character and heritage-listed homes that need more than a refresh

PROJECTS COMPLETED

135 in Brisbane

CONTRACT

Fixed price, set once the design and approvals are complete

Brisbane’s timber houses were built for another century. A major renovation is how they catch up: raised, extended, replanned or restored, and drawn, priced and built by one team.

A recent Stark Builders project in Brisbane

BRISBANE · THE NEW KITCHEN, MARBLE ISLAND AND BRASS UNDER THE ORIGINAL VJ CEILING

FOUR TYPES OF RENOVATION. ONE STUDIO THAT DRAWS, PRICES AND BUILDS ALL OF THEM.

UNDER WAY · A QUEENSLANDER RAISED ON NEW STEEL, THE REAR EXTENSION FRAMED

/01

/01

What counts as a major renovation

Graceville, a Queenslander raised on new posts with the new level open beneath

A major renovation is work that changes how a house is built, how big it is or how it is planned, rather than what it is finished with. It means a house lifted to legal height with a new level beneath it, a new wing at the rear, walls moved to make one living room out of three, or a heritage-listed house restored room by room. Most of the houses we work on are pre-1947 timber Queenslanders and character homes within about 7 km of our Fairfield studio.

CHARACTER, HERITAGE AND THE BRISBANE CITY PLAN

Two rules shape most of these projects. Houses built before 1947 usually sit in the Traditional Building Character overlay of the Brisbane City Plan, which governs what changes at the street and rarely touches the rear or the inside. A much smaller number are heritage-listed, and those need a heritage consultant and a different approval path. The four pages below explain each type of work. This page helps you work out which type your house needs.

Four types of major renovation in Brisbane

/02

Not sure which way to go? That is normal. Bring the house to our Studio and we will work through the options together.

Why Stark for a major renovation

/03

Every major renovation is a design problem and a building problem at once, and the expensive mistakes happen in the gap between the two. We closed the gap. The people who draw your house, price it and get it approved are the people who build it, from one studio in Fairfield. We have worked this way since 1989.

The Stark Builders crew standing under a raised Queenslander mid-build, Brisbane

THE STARK CREW · UNDER A RAISED QUEENSLANDER

ONE CREW, FIRST DRAWING TO HANDOVER

ONE STUDIO, DESIGN TO HANDOVER

One contract per stage, one team across all of them. The estimate at concept, the fixed price at approval and the house at handover are made by the same people, so nothing is lost between drawing and site.

Thirty-seven years of Brisbane houses

Since 1989 we have raised, extended, replanned and restored Brisbane houses of every era. Queenslanders hide their problems behind the linings, and we have met most of them before the first sheet comes off.

PRICED BEFORE IT IS BUILT

Design and planning are fixed fees. The build is a fixed price, set from finished drawings once the approvals are in, and run to a detailed construction program with a monthly meeting on site.

THE PROOF

THE PROOF

GOOGLE RATING

GOOGLE RATING

4.8

PROJECTS COMPLETED

135 in Brisbane

STRUCTURAL WARRANTY

STRUCTURAL WARRANTY

7 YEARS

7 YEARS

MASTER BUILDERS

MASTER BUILDERS

SINCE 1989

QBCC

QBCC

15229232

15229232

A Queenslander mid-raise on new steel posts, Stark Builders crew on site

THE NEW OUTDOOR ROOM BESIDE THE HOUSE, UNDER A TIMBER PERGOLA

CLAYFIELD

Steel beam and timber bearer detail during a raise
Steel beam and timber bearer detail during a raise

THE STUDY UNDER THE ROOF, LINED IN VJ BOARD

How it happens

/04

/04

The major renovation process, from consult to handover

01

01

Consult

1–2 WEEKS

An hour at our Fairfield studio, or a $450 site visit if you would rather we see the house first. We talk through what does not work, which of the four types of work the house and the block call for, and you leave with an estimate and a clear next step.

02

02

Design

12–18 WEEKS

Our architectural designer takes it from concept to construction drawings, priced as they develop so the design and the budget arrive together. The fee is fixed at $10–20k depending on the size of the job, and the drawings are yours.

03

03

Plan

6–12 WEEKS

Engineering, soil testing, energy compliance and the building approval, plus a development application where the character overlay, the height limit or a heritage listing calls for one. Fixed at $10–15k, at cost. The build price is set once the approvals are in.

04

04

Build

6–12 MONTHS ON SITE

Our own team from strip-out to handover, working to a detailed construction program with a monthly site meeting. Normally you cannot stay in the house. Raises run longest and internal replans shortest, and every service page gives its own range. A 7-year structural warranty covers the work.

04 BUILD · FINISHED

THE LOWER LEVEL OPENED TO THE GARDEN AND PLUNGE POOL

THE NEW BATHROOM IN STONE, TILE AND BRASS

What a major renovation costs in Brisbane

What a major renovation costs in Brisbane

/05

Three stages, priced in the order they happen: design is a fixed fee of $10–20k, planning and approvals $10–15k, then the build at a rate per square metre that depends on the type of work. Our project minimum is $500k. Each service page works the rates through example sizes. All figures include GST.

FIGURES REVIEWED SEPTEMBER 2026

FIGURES REVIEWED SEPTEMBER 2026

TYPE OF WORK

BUILD RATE PER M²

WHAT MOVES IT

Raise and build under

Raise and build under

New $5,500–7,500 · Reworked $2,500–4,500

The height of the lift, the slope and soil, and how much of the lower level is habitable

Home extension

Home extension

New $5,000–7,000 · Reworked $2,500–4,500

Floor area, one storey or two, and how much of the old house is replanned to meet it

Queenslander renovation

Queenslander renovation

New $5,000–7,500 · Reworked $2,500–4,500

How much of the plan moves, and the kitchen and bathroom count

Heritage renovation

Heritage renovation

New $5,500–7,500 · Reworked $4,000–6,000

What the citation protects, the consultant’s reports and the detail the listed fabric demands

WE PRICE THE HOUSE WHILE IT IS DRAWN

WE PRICE THE HOUSE WHILE IT IS DRAWN

Recent major renovations in Brisbane

/06

Recent Stark Builders project

HOLLAND PARK

RAISE AND BUILD UNDER · 2023

Recent Stark Builders project

COORPAROO

QUEENSLANDER RENOVATION · 2025

Recent Stark Builders project

HAWTHORNE

HERITAGE RENOVATION · 2024

Three houses, three of the four types: a house raised and built under, a Queenslander replanned inside, and a heritage-listed house restored. The extensions page carries its own. Every one drawn, priced and built by this studio.

The four types, side by side

/07

Raise and build under

Home extensions

Queenslander renovations

Heritage renovations

THE BLOCK

THE BLOCK

Small, sloping or fully built out

Room at the rear or side, inside the setbacks

Any

Any, but the listing decides what can change

APPROVALS

APPROVALS

Building approval; planning where the house would exceed 9.5 m

Building approval; planning near a boundary or under the overlay

Building approval; planning where the street face is touched under the overlay

Heritage exemption or development application, then building approval

ON SITE

ON SITE

9–12 months

6–9 months

6–12 months

6–12 months

YOU GAIN

YOU GAIN

A whole level on the same footprint

New living, bedrooms or outdoor space

Light, flow and rooms that work

A listed house that works for the family, its significance kept

In their words

/08

What Brisbane clients say about their major renovation

From day one communications were quick and easy. Attention to detail was amazing with no small detail missed. It felt like the team at Stark really cared about this project and our home. We couldn’t be happier with the house.

HAIDI & JOHN

WHERE WE RENOVATE

BRISBANE’S CHARACTER SUBURBS, WITHIN 7 KM OF OUR FAIRFIELD STUDIO

Is your project a major renovation?

/10

If one or more of these is true, it is, and one of the four services above is the right place to go next.

Most people arrive knowing what is wrong with the house, not what to call the fix. These are the signs, and what each one usually points to.

The house is on stumps

A timber house on stumps can be lifted. If the block is tight or sloping, raising it is usually the most efficient way to double the floor area.

You need more floor

Another bedroom, a second living room, a home office. The choice is between building out at the rear and building under, and the block usually decides.

The plan is the problem

Rooms in the wrong place, a kitchen at the wrong end, no connection to the garden. Finishes will not fix it. Walls have to move, and that is a Queenslander renovation.

It was built before 1947

It almost certainly sits in the Traditional Building Character overlay, so the street face is governed and the rear is free. Knocking it down is normally off the table. Renovating it is the answer.

It is heritage-listed

A listing on the Brisbane or Queensland register changes the approvals and brings a heritage consultant onto the team. The house can still be renovated, with more care and more planning.

The budget starts at $500k

Our project minimum. Below it a major renovation is hard to do well. Above it, all four types of work open up, and the first meeting tells you which one the house needs.

Before you start

/11

Height limits, character overlays and flood rules for renovating in Brisbane

Four things worth knowing before you call anyone.

None of them rule the work out. They decide the approvals path, the program and where the money goes.

01

01

THE OVERLAY AND THE HEIGHT LIMIT

Most pre-1947 houses in Brisbane sit in the Traditional Building Character overlay. It protects the form of the house from the street: the roof, the verandah, the front rooms. Work at the rear and inside is largely free of it. Brisbane’s height limit is 9.5 m, and most raises and new upper levels sit under it. A steep block can push past it, and then council planning is involved, which adds time.

02

FLOOD

On a flood-affected block council sets the habitable floor level, and that alone can decide whether you raise or extend. Raising is often the cleanest answer. It lifts the living areas clear of future floods and can change your insurance position.

03

THE HOUSE ITSELF

Timber houses hide their condition until the linings come off. Every major renovation exposes bearers, joists and frame, and we inspect and treat what is open and replace what the years have taken, so the house you get back is sound as well as bigger.

04

LIVING THROUGH IT

Normally you cannot stay in the house. A raise lifts it off its stumps, and an extension or replan opens the roof, the walls and the services. Plan for 6–12 months elsewhere and build the move into the program from the start.

A new bathroom below the original floor line of a raised Queenslander

COORPAROO · VERANDAH ABOVE, NEW LIVING BELOW, THE POOL WHERE THE YARD WAS

The best major renovation does not look like one. It looks like the house was always meant to be this way.

Common questions

/12

Major renovation questions from Brisbane homeowners

What counts as a major renovation?

Work that changes the structure, size or plan of the house rather than its finishes: raising and building under, extending, replanning the interior, or restoring a heritage-listed house. A new kitchen on its own is a renovation. A new kitchen in a new wing, with the old rooms replanned around it, is a major one.

Should we raise, extend or replan?

Raise when you need a whole level and the block is tight or sloping. Extend when the block has room at the rear and the plan is mostly right. Replan when the size is right and the rooms are wrong. Most houses only need one, and the first meeting usually settles which.

What does a major renovation cost in Brisbane?

Design is a fixed fee of $10–20k and planning and approvals $10–15k. The build is priced per square metre: $2,500–4,500 for existing floor reworked, rising to $4,000–6,000 on a heritage-listed house, and $5,000–7,500 for new floor built, whether extended or built under. Our project minimum is $500k and most land between $500k and $1.5m. All figures include GST.

How long does a major renovation take in Brisbane?

Four to seven months of design, planning and approvals, then six to twelve months on site depending on the type of work. Raises sit at the long end and internal replans at the short end. Each service page gives its own range.

Can we live in the house during the work?

Normally you cannot. A raise lifts the house off its stumps, and an extension or replan takes the roof, walls and services apart. We set the move-out and move-in dates in the construction program so you can plan around them.

Do I need a development application?

Often not. Most major renovations proceed on a building approval alone. A development application is triggered where the character overlay is affected at the street, where the house would exceed the 9.5 m height limit, where the work sits close to a boundary, or where the house is heritage-listed. We check all of those before the design begins.

Is a Queenslander renovation different from a heritage renovation?

Yes. A Queenslander or character renovation is work on a pre-1947 timber house, usually in the Traditional Building Character overlay, which governs the street face. A heritage renovation is work on a house formally listed on the Brisbane or Queensland heritage register, which protects its significant fabric and requires a heritage consultant. Most old Brisbane houses are character, not heritage.

Do you design as well as build?

Yes. Every major renovation starts in our Fairfield studio with our own building designers. Design, planning and approvals, engineering and construction run under one roof, so the price is set by the people who will build it, and the drawings are built by the people who drew them.

STILL HAVE A QUESTION?

STILL HAVE A QUESTION?

Ask us directly.

A short call is usually the quickest way to work out which of the four types of renovation your house needs, and what it might involve.

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/13

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/13

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/13

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

9 FORSYTH ST,

FAIRFIELD QLD 4103,

AUSTRALIA

QBCC 22698 · QBCC 15229232

MEMBER — MASTER BUILDERS AUSTRALIA

© 2026 FSX DEVELOPMENTS PTY LTD