Raise and Build Under in Brisbane

01

HOLLAND PARK, 2023 · HOUSE RAISED FOR A NEW LOWER LEVEL, CARPORT AND OPEN-PLAN LIVING

WHAT IT IS

Raise and build under lifts a timber Queenslander to legal height and builds a full new level beneath it, doubling the floor area on the same block. The house keeps its character and its street presence. The upper level can be reworked in the same job, so the whole home is renovated at once. You get the house your family needs without leaving the street you chose.

TIMEFRAME

9–12 months on site, after 4–6 months of design and approvals

SUITED TO

Timber homes on stumps, pre-1947 or post-war

HOUSES RAISED

48 in Brisbane

CONTRACT

Fixed price, set once the drawings are complete

HOUSE RAISING AND BUILDING UNDER · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Raised and built-under Queenslander in Holland Park, Brisbane: white weatherboard house with a new lower level and carport, by Stark Builders

Raise and Build Under in Brisbane

01

HOLLAND PARK, 2023 · HOUSE RAISED FOR A NEW LOWER LEVEL, CARPORT AND OPEN-PLAN LIVING

WHAT IT IS

Raise and build under lifts a timber Queenslander to legal height and builds a full new level beneath it, doubling the floor area on the same block. The house keeps its character and its street presence. The upper level can be reworked in the same job, so the whole home is renovated at once. You get the house your family needs without leaving the street you chose.

TIMEFRAME

9–12 months on site, after 4–6 months of design and approvals

SUITED TO

Timber homes on stumps, pre-1947 or post-war

HOUSES RAISED

48 in Brisbane

CONTRACT

Fixed price, set once the drawings are complete

HOUSE RAISING AND BUILDING UNDER · BRISBANE

STARK BUILDERS · FAIRFIELD, BRISBANE

MAJOR RENOVATIONS · ARCHITECTURAL DESIGN

QBCC 15229232 · SINCE 1989

01

Raised and built-under Queenslander in Holland Park, Brisbane: white weatherboard house with a new lower level and carport, by Stark Builders

Raise and Build Under in Brisbane

01

HOLLAND PARK, 2023 · HOUSE RAISED FOR A NEW LOWER LEVEL, CARPORT AND OPEN-PLAN LIVING

WHAT IT IS

Raise and build under lifts a timber Queenslander to legal height and builds a full new level beneath it, doubling the floor area on the same block. The house keeps its character and its street presence. The upper level can be reworked in the same job, so the whole home is renovated at once. You get the house your family needs without leaving the street you chose.

TIMEFRAME

9–12 months on site, after 4–6 months of design and approvals

SUITED TO

Timber homes on stumps, pre-1947 or post-war

HOUSES RAISED

48 in Brisbane

CONTRACT

Fixed price, set once the drawings are complete

Our studio is a raised Queenslander. Come and stand under it, and you will understand the rest of this page better than we can explain it.

Stark Builders’ Fairfield studio, a raised Queenslander with a new arched lower level built beneath the original house

THE STARK STUDIO · 9 FORSYTH ST, FAIRFIELD · A RAISED QUEENSLANDER WITH A NEW LEVEL BENEATH

THE HOUSE ABOVE IS ORIGINAL. EVERYTHING BELOW THE VERANDAH IS NEW.

THE STUDIO MID-RAISE · FAIRFIELD, 1989

/01

/01

What a raise involves

Timber Queenslander mid-raise on tall steel posts with scaffolding and a temporary stair, Fairfield, 1989

A raise happens in a fixed order. The house is disconnected from its services, lifted, and set onto new steel posts and footings. The lower level is slabbed, framed and enclosed, the services are reconnected, and a new stair joins the two floors. Above, the character of the house is kept. The verandahs, ceilings and joinery can stay exactly as they are, or be reworked in the same job. The lift takes days. The lower level takes months.

WHAT THE NEW LEVEL CAN BE

The new level can be a full second floor of living: an open-plan kitchen and living area that steps straight out to the garden, bedrooms, a bathroom, a rumpus, a home office, or a self-contained level for parents or tenants. At the smaller end it is a garage, laundry and storage. Most families build the whole footprint, because the cost of the lift is the same either way.

/02

A HOLLAND PARK QUEENSLANDER BEFORE AND AFTER BEING RAISED

Before and after

The Holland Park Queenslander mid-raise in 2022, lifted off its stumps onto temporary supports behind Stark Builders site fencing

BEFORE

HOLLAND PARK, 2022 · MID-RAISE

The Holland Park Queenslander after its raise: new lower level, gable carport and white picket fence

AFTER

HOLLAND PARK, 2023 · RAISED WITH A NEW LEVEL BENEATH · UPPER LEVEL OPENED UP FOR OPEN-PLAN LIVING

Why Stark for a raise

/03

A raise is the one renovation where the drawings and the building cannot be separated. The height, the stair, the light under the verandah and the price all depend on each other, and we resolve them in one room before anyone is on site.

The Stark Builders crew standing under a raised Queenslander mid-build, Brisbane

THE STARK CREW · UNDER A RAISED QUEENSLANDER

ONE CREW, FIRST DRAWING TO HANDOVER

DESIGN AND BUILD, ONE STUDIO

Our architectural designer and our builder sit at the same table from the first sketch, so what gets drawn can be priced, approved and lifted without surprises.

TWO GENERATIONS OF QUEENSLANDERS

Two generations of one family, the same kind of house. We know how a timber house moves, where the stumps fail, and what to check before the jacks go under it.

ONE CREW, FIXED PRICE, WARRANTED

The same crew from the lift to handover, a fixed price from complete documentation, a construction program you can hold us to, monthly site meetings and a seven-year structural warranty.

THE PROOF

THE PROOF

GOOGLE RATING

GOOGLE RATING

4.8

HOUSES RAISED

48 in Brisbane

STRUCTURAL WARRANTY

STRUCTURAL WARRANTY

7 YEARS

7 YEARS

MASTER BUILDERS

MASTER BUILDERS

SINCE 1989

QBCC

QBCC

15229232

15229232

Upper level of a raised Queenslander in West End, Brisbane, opened up into a kitchen and living area with a timber island, stone benchtop and doors to the deck

THE UPPER LEVEL OF A RAISED QUEENSLANDER, OPENED UP AND REFRESHED

WEST END, 2025

White shaker kitchen with marble mosaic splashback and brushed brass gooseneck tap, Holland Park raise and build under
White shaker kitchen with marble mosaic splashback and brushed brass gooseneck tap, Holland Park raise and build under

HOLLAND PARK, 2023 · RAISED AND BUILT UNDER

How it happens

/04

/04

The raise and build under process, from consult to handover

01

01

Consult

1–2 WEEKS

An hour at our Fairfield studio. We talk through height, access and what the lower level needs to do, and you leave with an estimate. If you would rather we see the house first, a site visit is $450.

02

02

Design

12–18 WEEKS

Our architectural designer resolves the new level with the old house: the stair, natural light, how the living opens up, and how the house meets the street and the yard. The drawings are priced as they develop.

03

03

Plan

6–8 WEEKS

Engineering, soil testing, energy compliance and the building approval, through a private certifier, all arranged by us. The fixed price is set once the documentation is complete.

04

04

Build

9–12 MONTHS ON SITE

One crew from the lift to handover, with a detailed construction program. You move out for the build and come back to a finished house, top and bottom, in one go.

04 BUILD · FINISHED, THE STUDIO

Stark Builders design studio in Fairfield: oak joinery wall of material samples, round table and pendant light

DESIGN STUDIO · WHERE THE DESIGN AND PLANNING HAPPEN

Travertine stone basin with dark bronze tapware in the studio bathroom beneath the raised house

STUDIO BATHROOM UNDER THE RAISED HOUSE

What a raise costs in Brisbane

/05

Three stages, priced in the order they happen. Most raises land between $500k and $1.5m all in, depending on how much you build below, how much you rework above, and the level of finish. Design and planning are fixed fees. The build is two rates: new floor below the house per square metre built, and the house above per square metre reworked. Figures include GST.

WHAT MOVES THE RATES

Soil and slope, street access, how many wet areas go below, whether the finished height passes 9.5m, the level of finish, and what the frame looks like once the house is up. Each is answered in the questions further down.

01 DESIGN

$10–20k

Concept to construction drawings

02 PLANNING AND APPROVALS

$10–15k

Engineering, soil testing, approvals, for one fixed fee

03 BUILD · TWO RATES

NEW FLOOR, BUILT

$5,500–7,500 / m²

New level below: lift, steel, slab, enclosure, services and fit-out. Finishes set the top of the range.

EXISTING HOUSE, REWORKED

EXISTING HOUSE, REWORKED

$2,500–4,500 / m²

The house above, per square metre renovated: repairs, replanned rooms, wet areas and finishes.

FIGURES REVIEWED SEPTEMBER 2026

FIGURES REVIEWED SEPTEMBER 2026

110 m²

A SMALL LOWER LEVEL

70 m² of new level below: a bedroom, bathroom, laundry and rumpus.

40 m² reworked above: a new internal stair, one bathroom updated and the living room opened up.

01 DESIGN

$10–20K

02 PLANNING

02 PLANNING

$10–15K

03 NEW FLOOR 70 M²

$385k

03 REWORK 40 M² ABOVE

$100k

ALL IN, FROM · AT THE LOWER END OF EACH RATE

$505k

$505k

180 m²

A FAMILY LOWER LEVEL

100 m² of new level below: two or three bedrooms, a bathroom, laundry and rumpus.

80 m² reworked above: a new kitchen, open-plan living and refreshed bathrooms.

01 DESIGN

$10–20K

02 PLANNING

02 PLANNING

$10–15K

03 NEW FLOOR 100 M²

$550k

03 REWORK 80 M² ABOVE

$200k

ALL IN, FROM · AT THE LOWER END OF EACH RATE

$770k

$770k

240 m²

A FULL SECOND HOUSE

140 m² of new level below, the whole footprint: open-plan kitchen, living and dining, with a butler’s pantry, laundry, bathroom and a media room or garage.

100 m² reworked above: the old kitchen and living become a main bedroom with ensuite and parents’ retreat.

01 DESIGN

$10–20K

02 PLANNING

02 PLANNING

$10–15K

03 NEW FLOOR 140 M²

$770k

03 REWORK 100 M² ABOVE

$250k

ALL IN, FROM · AT THE LOWER END OF EACH RATE

$1.04m

$1.04m

Recent raises in Brisbane

/06

Raise, extend or rebuild a Queenslander?

/07

Three ways to get more house on the same block.

Compared on the four things that decide it: footprint, cost, time and what survives.

RAISE AND BUILD UNDER

THIS PAGE

THIS PAGE

FOOTPRINT

FOOTPRINT

Kept, or grown a little for a larger level below

COST

COST

Higher per m² than new, the lift and steel are in the rate, but less overall because the house is kept. From $500k

TIME

TIME

9–12 months, out of the house throughout

WHAT SURVIVES

WHAT SURVIVES

The original house above, reworked at least in part

HOME EXTENSION

READ MORE →

READ MORE →

FOOTPRINT

FOOTPRINT

Grows into the garden

COST

COST

Higher per m² than new and a little under a raise, but less overall because the house is kept. From $500k

TIME

TIME

6–9 months, usually out of the house

WHAT SURVIVES

WHAT SURVIVES

The original house, opened up and partly reworked

KNOCKDOWN AND REBUILD

READ MORE →

READ MORE →

FOOTPRINT

FOOTPRINT

Reset to what planning allows

COST

COST

Lowest per m², but every square metre is new. From $1m

TIME

TIME

12–18 months, out of the house throughout

WHAT SURVIVES

WHAT SURVIVES

None of the original. Not possible under a character overlay

In their words

/08

What Brisbane clients say about their raise

We have just moved back in and are thrilled with our freshly renovated home. Especially the new kitchen that leads onto our back deck. Absolutely amazing.

WHERE WE RAISE HOUSES

BRISBANE’S CHARACTER SUBURBS, WITHIN 7 KM OF OUR FAIRFIELD STUDIO

Is a raise right for your house?

/10

If three or more of these are true, it usually is.

Not every Queenslander should be raised, and we will tell you if yours is one of them. But the houses that suit it share a few things, and most of them you can check from the footpath.

Timber house on stumps or posts

Brick and slab homes rarely raise economically.

Block under about 600 m²

Too small to extend outward without losing the garden.

Less than 2.4m of clearance underneath now

Under 2.4m it cannot be habitable space, so you are paying for room you cannot use.

In a flood-affected or overland-flow area

Raising lifts living areas above the mapped level.

Pre-1947 and in a character overlay

Demolition is controlled, so a raise is the only viable way to get more house on the block.

You need more than one extra room

A whole new level is where a raise beats an extension.

Before you start

/11

Height limits, character overlays and flood rules for raising a house in Brisbane

Four things worth knowing before you call anyone.

None of them rule a raise out. They decide the approvals path, the program and where the money goes.

01

HEIGHT

Most raises sit well under Brisbane’s 9.5m height limit. Occasionally a steep block pushes past it, and council planning is involved, which adds time.

02

CHARACTER OVERLAY

Pre-1947 homes in the Traditional Building Character overlay can be raised. Demolition is controlled, so the street-facing form is protected and a raise is often the only way to add space.

03

FLOOD

Raising is often the cleanest answer on a flood-affected block, and can change your insurance position.

04

TIMBER AND TERMITES

A raise exposes every bearer and joist. We inspect and treat the frame while it is open and replace what the years have taken.

Rear of a raised Queenslander in Brisbane with new timber stairs to the upper deck and a glazed lower level

THE BACK OF A RAISED HOUSE · NEW LEVEL OPENING TO THE GARDEN

The rooms nobody could see from the street are the ones the family lives in.

Common questions

/12

Raise and build under questions from Brisbane homeowners

How long does a raise and build under take?

A standard raise runs nine to twelve months on site, with four to six months of design, engineering and approvals before that. The lift itself takes days; the lower level takes the time.

Can we live in the house during the work?

No. A raise is a full construction site from the lift to handover, so you move out for the nine to twelve months on site and come back to a finished house, top and bottom. We work through the timing with you before the contract is signed.

Do we need council approval to raise?

Usually not. For most raises a private certifier issues the building approval. Council planning is only needed occasionally, for example when the street facade is altered or the new level sits inside a boundary setback, and we manage it when it is.

What does a raise typically cost?

Most raises land between $500k and $1.5m all in, including design, approvals and GST. Floor area sets the base. What moves the number fastest is the count of wet areas below, the level of finish and any architectural features such as large openings, cantilevers or double-height spaces. Poor access or a house in bad condition can push a full project past $2m. You leave the studio visit with a range, and the price is fixed once the documentation is complete.

Will the old house be damaged by the lift?

Not when it is done properly. Timber Queenslanders were built to be moved. We brace, lift evenly and re-level before any new work begins, and repair any hairline movement in the fit out. The one common exception is old sash windows: a re-levelled frame can leave worn sashes sticking, and some need restoration.

How high can the house be raised?

As high as the design needs. On most blocks that gives a full 2.7m ceiling on the new level, and the overall height limit is rarely the constraint. On flood affected blocks the limit can be relaxed so that 2 full levels sit above the flood level.

Do you handle the engineering and soil tests?

Yes. Soil testing, structural engineering and energy compliance are arranged by us inside the plan stage, for one fixed fee, and the results are priced before you sign a building contract.

Can the new lower level match the old house?

It can, and usually should at the street. Below the verandah line we tend to go more open and contemporary, but cladding, colours and window rhythm are drawn to sit with the original.

STILL HAVE A QUESTION?

STILL HAVE A QUESTION?

Ask us directly.

A short call is usually the quickest way to work out whether a raise suits your house, and what it might involve.

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/12

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/12

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

Let’s talk about your home

We take on a limited number of renovations each year and book well in advance. Tell us about the house and we will call within one business day.

Some of the best renovations begin with a simple conversation.

/12

If you are thinking about renovating your house, we would love to hear about it early, even at sketch stage.

GOOGLE RATING

4.8

STRUCTURAL WARRANTY

7 YEARS

MASTER BUILDERS

SINCE 1989

9 FORSYTH ST,

FAIRFIELD QLD 4103,

AUSTRALIA

QBCC 22698 · QBCC 15229232

MEMBER — MASTER BUILDERS AUSTRALIA

© 2026 FSX DEVELOPMENTS PTY LTD